Development of Cost Planning Standards for Design Development, Sitework, and Structure for Stadium Area Works on Integrated Contracts for Main Stadium Building Based on Indonesian Minister of Public Works Regulation Number 22 of 2018 to Improve Cost Accuracy
Main Article Content
Abstract
Increasing development and future planning on the sports tourism in Indonesia, is not in line with the planning execution process, particularly on the construction plan application process in several big projects especially stadium construction. Ironically, stadium that can be classified as Bangunan Gedung Negara, should be one of the most important buildings which could be the main cantilever for all of the sports tourism activities and planning in Indonesia. This thing could be happened because there were not any policies has been made and issued by the Indonesian’s government institutions, which contains standard and clauses of stadium construction in particular.Moreover, the complexity rate of stadium construction process is also requiring the most efficient and effective method, particularly in cost planning, thus the project delivery accomplishment process can be conducted with a high accuracy rate. This degree of accuracy became so important, because there is a probability of project cost differ from the planning could be happened. Furthermore, there is a likelihood of dispute occurrence as the impact of the inaccurate cost planning in the project beginning.Because of that, the design and build method could be one of the best choices, as long as can be implemented following the standards that have been tested against the cost planning accuracy rate. However, because this kind of method has not been contained in any existing national standards, thus a development against the existing policies and standards became so crucial, in order to assisting the national planning and development especially in the sports tourism area. Therefore, a development for the existing policies that is the closest-to-be the solution of the issues above, which is Permen No. 22 issued in 2018, need to be conducted as soon as possible.